We participate in the next stage of the bridge construction in Sobieszewo [dodano 2018-07-31]

The drawbridge is being built over the Martwa Wisła River in Sobieszewo in order to strengthen the permanent connection of the Sobieszewo Island with the mainland. The new bridge will be 173 m long, with wings: 181.5 m. Its opening time will be only 150 seconds, which will significantly improve the access to Sobieszewska Island.
The bridge was bolted in July. The assembly of cylinders and hydraulic power supplies for the construction of the bridge is currently underway. The solutions in the field of power hydraulics and automation were prepared by the specialists from our company.
We would like to thank the companies from the building consortium for a successful cooperation.




Find:
Send your inquiry:
Your e-mail address:
Company name/Surname:
Phone number:
Subject:
Inquiry:

Visited: 170282
up up
Offer  |  Promotion  |  Company  |  Contact  |  News  |  Home
(C)2013 Hydromega